SHA Contract # BA9775A72
Baltimore Beltway - Interchange at Charles Street (MD 139) Phase 1
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $37.9 Million
Duration: 1030 Calendar Days
Prime Contractor: The Six M Company
Project Manager: Mike Randow
|
|
 |
MAA Contract # MAA-CO-09-009
C/D Apron Reconstruction
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $36.7 Million
Duration: 615 Calendar Days (Contract Complete)
Prime Contractor: P. Flanigan & Sons, Inc.
Project Manager: Keith Jones
|
|
 |
Baltimore City DOT Contract # TR08310
Rehabilitation of Central Avenue and Storm Drain – Eastern Avenue to Madison Street
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $27.8 Million
Duration: 1960 Calendar Days
Prime Contractor: Monumental Paving & Excavating, Inc.
Project Manager: Dan Rocks
|
|
 |
VDOT Contract # C00060864C01_B01
Stringfellow Road (Rte. 645) Widen to Four Lanes
Work Performed: Prepared Baseline Critical Path Method Schedule
Value: $22 Million
Duration: 859 Calendar Days
Prime Contractor: Fort Myer Construction
Project Manager: Austin Anderson
|
|
 |
DCWASA Contract # 100210
Nitrification Facilities Upgrade – Switchgear Replacement
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $16.4 Million
Duration: 1080 Calendar Days
Prime Contractor: Cynergy Electric Co., Inc.
Project Manager: Tony Hastings
|
|
 |
SHA Contract # BA6015180
Replacement of Bridge No. 311905 on I-695 (Baltimore Beltway Inner Loop) over MD 372 (Wilkens Avenue)
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $12.9 Million
Duration: 730 Calendar Days
Prime Contractor: The Six M Company
Project Manager: Mike Randow
|
|
 |
MdTA Contract # FT 749-000-006R
Rehabilitation of I-95 South of the Fort McHenry Tunnel
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $12.4 Million
Duration: 550 Calendar Days (Contract Complete)
Prime Contractor: P. Flanigan & Sons, Inc.
Project Manager: Phil Blake
|
|
 |
MdTA Contract # HT 2458-000-006
Deck Replacement of I-895 Bridges over Patapsco Ave., Potee St. and Hanover St., and Misc. Repairs
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $9.6 Million
Duration: 568 Calendar Days
Prime Contractor: The Six M Company
Project Manager: Jeff Bracey
|
|
 |
MdTA Contract # FT 710-000-002R
Upgrade and Replace Existing Signing with Bridge Modifications North of the Fort McHenry Tunnel
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $8.9 Million
Duration: 610 Calendar Days (Contract Complete)
Prime Contractor: Midasco, LLC
Project Manager: Jim Blazek
|
|
 |
SHA Contract # WA1995171R
Widen US 40 at Edgewood Drive Intersection
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $6.06 Million
Duration: 260 Working Days (Contract Complete)
Prime Contractor: Pessoa Construction Co.
Project Manager: Richard Macdonnell
|
|
 |
MdTA Contract No.: KB-2423-000-0006
Cleaning and Painting and Miscellaneous Repairs for Approach Spans of Francis Scott Key Bridge
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $5.5 Million
Duration: 581 Calendar Days
Prime Contractor: Klicos Painting Company
Project Manager: Andrea Savvakis
|
|
 |
SHA Contract # BA4215180
Replacement of Bridge No. 03214 on Middletown Road over I-83
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $5.4 Million
Duration: 436 Calendar Days
Prime Contractor: The Six M Company
Project Manager: Jeff McCoy
|
|
 |
SHA Contract # PG1755270
MD 5 at Brandywine Road and MD 37
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $4.8 Million
Duration: 18 Months (Contract Complete)
Prime Contractor: Facchina Construction Co., Inc.
Project Manager: Nick Cox
|
|
 |
MdTA Contract # HT 2448-000-006
Bridge Deck Overlay and Miscellaneous Repairs I-895 K-Truss over CSXT Railroad
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $4.7 Million
Duration: 100 Calendar Days
Prime Contractor: Eastern Highway Specialists, Inc.
Project Manager: Chris Magdefrau
|
|
 |
MdTA Contract # FT 2652-000-006
Zone Painting of Various Bridges on I-95 North of the Fort McHenry Tunnel
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $3.9 Million
Duration: Complete by July 2014
Prime Contractor: Atlas Painting & Sheeting Corp.
Project Manager: TBD
|
|
 |
MdTA Contract # BB 2439-000-006
Substructure Repairs to Approaches to Westbound Span of William Preston Lane, Jr. Memorial Bridge over Chesapeake Bay
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $3.7 Million
Duration: 365 Calendar Days
Prime Contractor: M. D. Miller Co., Inc. t/a The Marksmen Co.
Project Manager: Josh Hahn
|
|
 |
MdTA Contract # KB 2569-000-006
Cleaning and Painting of Bridge No. B-Z46205, MD-695 Inner Loop over Bear Creek
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $3.2 Million
Duration: 450 Calendar Days
Prime Contractor: Reglas Painting Company
Project Manager: Rodger Hamrick
|
|
 |
MTA Contract # T-0529-0240
Repairs to Baltimore Metro Underground Structures
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $2.9 Million
Duration: 1095 Calendar Days (Contract Complete)
Prime Contractor: Pioneer Contracting Co., Inc.
Project Manager: B.B. Patel
|
|
 |
Carroll County Public Schools Contract No.: 12-036N
Robert Moton Elementary School Open Space Enclosures
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $2.7 Million
Duration: 465 Calendar Days
Prime Contractor: Roy C. Kline Contractors
Project Manager: Rob Kline
|
|
 |
SHA Contract # AA4805180
Bridge Deck Replacement on Hammonds Ferry Road over MD Route 295
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $2.7 Million
Duration: 184 Working Days (Contract Complete)
Prime Contractor: Brawner Builders, Inc.
Project Manager: David Berkheimer
|
|
 |
SHA Contract No.: AX3765460
PB-A Contract - Wetland Mitigation, Reforestation, and Stream Restoration within the Upper Paint Branch Special Protection Area
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $2.5 Million
Duration: 140 Working Days
Prime Contractor: Locust Lane Farms
Project Manager: Steve Orange
|
|
 |
MdTA Contract # MA-951-000-002
Lighting Renovations at the I-95/I-395 and I-95/I-895 Interchanges
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $2.5 Million
Duration: 315 Calendar Days (Contract Complete)
Prime Contractor: Midasco, LLC
Project Manager: Mike Klohr
|
|
 |
MdTA Contract # MA-2581-000-006
Bridge Deck Overlay and Miscellaneous Repairs for I-895A NB Ramp over I-895B and Quarantine Road over MD-695
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $2.3 Million
Duration: 540 Calendar Days
Prime Contractor: M. D. Miller Co., Inc. t/a The Marksmen Co.
Project Manager: Josh Hahn
|
|
 |
MTA Contract # T-0239-0240
Metro Bridge and Elevated Structures Rehabilitation
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $2.0 Million
Duration: 730 Calendar Days (Contract Complete)
Prime Contractor: Pioneer Contracting Co., Inc.
Project Manager: B.B. Patel
|
|
 |
MdTA Contract # HT 2599-000-006
Cleaning and Painting of Bridges on Baltimore Harbor Tunnel Thruway
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $1.9 Million
Duration: Complete by October 2013
Prime Contractor: Titan Industrial Services, Inc.
Project Manager: Michael Forakis
|
|
 |
Anne Arundel County DPW Contract No.: W799402
Severndale WTP Chemical Systems Upgrade
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $1.7 Million
Duration: 360 Calendar Days
Prime Contractor: J. L. W. Associates, Inc.
Project Manager: Wendy Barry
|
|
 |
SHA Contract # PG3245168
Replacement of Bridge No. 1600900 on MD 725 (Old Marlboro Pike)
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $1.6 Million
Duration: 206 Working Days (Contract Complete)
Prime Contractor: Chevy Chase Construction
Project Manager: Robert Fish, Jr.
|
|
 |
MdTA Contract # MA-2081-000-006
Renovation to Navigational Aids at Various Facilities
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $1.6 Million
Duration: 315 Calendar Days (Contract Complete)
Prime Contractor: Midasco, LLC
Project Manager: Mike Klohr
|
|
 |
MdTA Contract No.: KB-2574-000-006
Cleaning and Painting of Bridges on Francis Scott Key Bridge Facility
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $1.3 Million
Duration: 211 Calendar Days
Prime Contractor: Reglas Painting Co., Inc.
Project Manager: Rodger Hamrick
|
|
 |
SHA Contract # BA8615180
Rehabilitation of Bridge No. 03209 on Downes Road over I-83
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $ 1.3 Million
Duration: 150 Working Days
Prime Contractor: PDI Sheetz Construction Corp.
Project Manager: Ken Sines (Contract Complete)
|
|
 |
MDTA Contract # FT 2266-000-002
Rehabilitation of Bridge BCW52200 (Ramp J from Hanover Street to I-95 Southbound)
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $1.16 Million
Duration: 210 Calendar Days (Contract Complete)
Prime Contractor: Pioneer Contracting Co., Inc.
Project Manager: B.B. Patel
|
|
 |
SHA Contract # AA4795180.
Deck Replacement and Substructure Repairs for Bridge Nos. 2019 and 2218 on Ridge Road over MD 295
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $1.04 Million
Duration: 145 Working Days (Contract Complete)
Prime Contractor: Pioneer Contracting Co., Inc.
Project Manager: B.B. Patel
|
|
 |
MDTA Contract # BB-2042-000-002
Bay Bridge Facilities Fuel Tank Replacement
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: 682,684.00
Duration: 180 Calendar Days (Contract Complete)
Prime Contractor: Joseph T. Hardy & Sons, Inc.
Project Manager: Jack Hardy
|
|
 |
MDTA Contract # BB-972-000-006
Route 50 Dynamic Message Signs Replacement
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $525,000
Duration: 315 Calendar Days (Contract Complete)
Prime Contractor: Midasco, LLC
Project Manager: Mike Klohr
|
|
 |
MDTA Contract # HT-2258-000-002
Replace Existing BHT Overheight Detection System
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $366,366.00
Duration: 180 Calendar Days (Contract Complete)
Prime Contractor: Midasco, LLC
Project Manager: Mike Klohr
|
|
 |
SHA Contract No.: AX3765W60
Intercounty County Connector PB-J Paint Branch Biotrenches Environmental Stewardship BMP Sites
Work Performed: Prepared and Updated the Required Critical Path Method Schedule
Value: $ 270,915
Duration: 60 Working Days
Prime Contractor: Locust Lane Farms
Project Manager: Steve Orange
|